电池(电)
网格
调度(生产过程)
电
公共交通
车辆到电网
计算机科学
汽车工程
储能
工程类
可靠性工程
功率(物理)
电动汽车
电气工程
运输工程
几何学
物理
量子力学
数学
运营管理
作者
Nader A. El-Taweel,Abdelrahman Ayad,Hany E. Z. Farag,Moataz Mohamed
标识
DOI:10.1109/tste.2022.3232696
摘要
In this paper, a novel optimization model is formulated to optimize the scheduling of battery swapping stations (BSS) operating electrified public bus transit fleets. The BSS consists of a number of battery modules that are combined together to create a MW-scale battery storage system. As such, the formulated optimization problem aims at minimizing the running costs of the BSS via i) exploiting the low electricity prices in the market (i.e., charging the battery modules at low prices), and ii) utilizing the BSS in the provision of grid ancillary services. The proposed model considers the operational requirements of the bus transit fleet to satisfy the energy needs of the battery electric buses (BEBs) and maintain their defined timetable. Also, the model integrates the power distribution network constraints such as bus voltages and line capacity limits to ensure its reliable operation. The impact of the BSS participation in the provision of ancillary grid services on the operation, degradation, and lifetime of the battery modules is investigated in this work by using a proposed saving cost index (SCI). It is demonstrated that the proposed model propels the economic viability of the BSS operation concept.
科研通智能强力驱动
Strongly Powered by AbleSci AI