钻探
地质学
构造盆地
石油工程
采矿工程
钻井
工程类
地貌学
机械工程
摘要
ABSTRACT Texaco drilled a well in southwest central Oklahoma which reached a total depth of 24,325 feet. This test presented a unique challenge both in planning and implementing the drilling program. The design, techniques, and practices followed to attain an optimum drilling program are presented.
科研通智能强力驱动
Strongly Powered by AbleSci AI