停工期
海上风力发电
收入
调度(生产过程)
涡轮机
唤醒
风力发电
资本成本
海洋工程
运筹学
环境科学
可靠性工程
工程类
运营管理
业务
财务
航空航天工程
电气工程
机械工程
作者
Miguel de Matos Sá,Francisco X. Correia da Fonseca,Luís Amaral,Rui Castro
标识
DOI:10.1016/j.oceaneng.2024.117518
摘要
Offshore wind farms, while strategically positioned to maximise wind energy capture, are exposed to harsh environments, impacting their reliability and accessibility. Low reliability and accessibility in turn translate into high Operation and Maintenance (O&M) costs, which represent approximately 30% of the total lifetime costs of the project. One approach to reduce O&M costs is to improve maintenance planning decisions. The present paper presents a novel O&M scheduling methodology for offshore wind farm operations based on wind and wave forecasts. The methodology forecasts farm yield considering farm wake effects to identify optimal operation schedules, vessel routing, and turbine maintenance sequences that minimise costs and revenue losses due to downtime. Weather forecast uncertainty is modelled and integrated into the decision-making process to minimise weather risks. A case study inspired by the WindFloat Atlantic floating wind project was used to demonstrate the optimisation potential. Results suggest that adopting the proposed methodology over business-as-usual scheduling significantly boosts offshore wind farm operational profits during the forecasted period, with increases ranging from 2% to 24%, depending on the scenario considered. It was found that integrating the wind farm wake losses into the scheduling decisions can improve the optimal scheduling solution and further minimise total operation costs.
科研通智能强力驱动
Strongly Powered by AbleSci AI