尺寸
延期
交流电源
分布式发电
可靠性工程
安装
工作(物理)
电力系统
还原(数学)
计算机科学
功率(物理)
数学优化
控制理论(社会学)
工程类
数学
电压
控制(管理)
可再生能源
电气工程
经济
视觉艺术
几何学
人工智能
量子力学
艺术
会计
物理
操作系统
机械工程
作者
Devender Singh,Rakesh R. Misra,Deependra Singh
出处
期刊:IEEE Transactions on Power Systems
[Institute of Electrical and Electronics Engineers]
日期:2007-11-01
卷期号:22 (4): 2204-2212
被引量:351
标识
DOI:10.1109/tpwrs.2007.907582
摘要
The effect of load models on distributed generation (DG) planning in distribution system is investigated in this work. It is shown that load models can significantly affect the DG planning. Normally a constant power (real and reactive) load model is assumed in most of the studies. Such assumptions may lead to inconsistent and misleading results about deferral values, loss reduction, payback period, and other subsequent calculations. It has been demonstrated that DG planning based on such assumptions would not be effective after implementation. It is shown that load models can significantly affect the optimal location and sizing of DG resources in distribution systems. A comparative study of real and reactive power loss, real and reactive power intake at the main substation and MVA support provided by installing DG resources for different type of loads models has been performed.
科研通智能强力驱动
Strongly Powered by AbleSci AI