尺寸
延期
交流电源
分布式发电
可靠性工程
安装
工作(物理)
电力系统
还原(数学)
计算机科学
功率(物理)
数学优化
控制理论(社会学)
工程类
数学
电压
控制(管理)
可再生能源
电气工程
经济
物理
量子力学
机械工程
艺术
几何学
会计
人工智能
视觉艺术
操作系统
作者
Devender Singh,Rakesh R. Misra,Deependra Singh
标识
DOI:10.1109/tpwrs.2007.907582
摘要
The effect of load models on distributed generation (DG) planning in distribution system is investigated in this work. It is shown that load models can significantly affect the DG planning. Normally a constant power (real and reactive) load model is assumed in most of the studies. Such assumptions may lead to inconsistent and misleading results about deferral values, loss reduction, payback period, and other subsequent calculations. It has been demonstrated that DG planning based on such assumptions would not be effective after implementation. It is shown that load models can significantly affect the optimal location and sizing of DG resources in distribution systems. A comparative study of real and reactive power loss, real and reactive power intake at the main substation and MVA support provided by installing DG resources for different type of loads models has been performed.
科研通智能强力驱动
Strongly Powered by AbleSci AI