水准点(测量)
公制(单位)
数据中心
计算机科学
核退役
持续性
网格
能量(信号处理)
工程类
运营管理
操作系统
数学
地理
统计
废物管理
几何学
生物
生态学
大地测量学
标识
DOI:10.1002/9781119597537.ch32
摘要
In addition to Power Usage Effectiveness (PUE), there are currently several energy and performance metrics designed specifically for data centers. This chapter focuses on metrics and evaluation programs, such as PUE, that are currently used by data center owners to benchmark data centers and look for ways to reduce energy use. The document PUE: A Comprehensive Examination of the Metric, authored by The Green Grid, provides guidance on a consistent methodology for establishing partial PUE (pPUE). Mechanical Load Component is fundamentally different than pPUE but still demonstrates efficiency of a subset of the data center energy use. Since the Green Grid released their white paper on PUE in October 2007, they have been developing a family of "xUE" metrics "designed to help the data center community better manage the energy, environmental, societal, and sustainability-compliance parameters associated with building, commissioning, operating, and decommissioning data centers.".
科研通智能强力驱动
Strongly Powered by AbleSci AI