调度(生产过程)
施工管理
计算机科学
建筑工程
工程类
运筹学
运营管理
风险分析(工程)
业务
土木工程
作者
Yuhong Wang,Yun Le,Jiukun Dai
标识
DOI:10.1061/(asce)me.1943-5479.0000349
摘要
A complex construction program usually consists of a group of interrelated projects with different levels of importance and degrees of certainty. Currently, time management of a construction program uses the same techniques as those for a single project, and the most commonly used technique is the critical path method (CPM). However, the CPM method lacks flexibility in handling uncertainties and options, a desirable feature in managing complex programs. This paper proposes a new scheduling method that is drawn from the authors' experiences of managing a large-scale construction program-the Shanghai Expo facility construction. The new method is developed on the basis of the traditional CPM method but is able to incorporate options and importance levels into the program schedule. The theoretical basis and calculation method of this new scheduling technique are discussed in the context of managing the Shanghai Expo facility construction program. This paper contributes to the body of knowledge in construction management by developing a new scheduling technique with proven applications.
科研通智能强力驱动
Strongly Powered by AbleSci AI