计算机科学
调度(生产过程)
成本估算
估计
可靠性工程
运筹学
工程类
实时计算
钥匙(锁)
不可预见费
施工管理
作者
Ratih Dewi Shima,Erma Desimaliana,Enrico Moreno
摘要
Value Engineering (VE) in construction projects is a systematic approach aimed to improve the value of an engineering product by assessing its functions, cost, quality and performance (the triple constraints). Value engineering goals is to optimize overall value by reducing unnecessary cost without compromising the triple constraint. Value Engineering benefits from Building Information Modelling (BIM) as a tool to visualize the construction design along with various scenarios and alternative methods. In Indonesia, the implementation of BIM has not been fully utilized nor obligatory to be used despite its effectivity in simulating various scenario of construction methods for commercial properties such as restaurant or café building. This study implements the effectiveness of BIM utility by comparing the value engineering of two construction methods (Bottom-Up and Top-Down Method) performances, for café building construction project study case. Two values used as the constraints of research are Cost estimation and Duration. The modelling process used Tekla Structures 2023 (Student License) software to generate beam and column capacity ratio along with time schedule between two construction methods. The outcome of the modelling concluded that the Bottom-Up Methods for café building has less Cost Estimation by 9,34% and 17 working days differences.
科研通智能强力驱动
Strongly Powered by AbleSci AI