调度(生产过程)
数学优化
作业车间调度
计算机科学
公平份额计划
整数规划
动态优先级调度
分布式计算
工程类
工业工程
算法
数学
嵌入式系统
计算机网络
地铁列车时刻表
布线(电子设计自动化)
服务质量
操作系统
作者
Tianning Liang,Zhou Li-ping,Zhibin Jiang
标识
DOI:10.1080/00207543.2024.2363435
摘要
This paper addresses the issue of integrated scheduling of production and material delivery in an intelligent manufacturing system. The system includes multiple flexible flowlines and a fleet of automated guided vehicles (AGVs), whose capacity is shared among the flowlines. Multiple orders from different customers are processed on the flowlines, with AGVs delivering materials in different batch sizes based on varying product quantities of orders and limited load capacity. The problem is formulated as a mixed-integer linear programming model to minimise total order delays and the number of used AGVs. To handle the complexity caused by the uneven temporal coupling relationship between production and material delivery, a bi-level neighbourhood search solution algorithm is proposed. This algorithm uses variable neighbourhood search for production scheduling and adaptive large neighbourhood search for material delivery scheduling. Extensive numerical experiments using real-case-based instances are conducted to demonstrate the satisfactory performance of our proposed algorithm. Furthermore, we emphasise the advantages of integrated scheduling compared to traditional sequential scheduling across various problem settings.
科研通智能强力驱动
Strongly Powered by AbleSci AI