摘要
Objective/Scope This paper discusses the S1 Sirikit Big Enhance Oil Recovery (EOR) polymer injection project, which has received approval to be expanded across the entire S1 region. In 2019, large-scale EOR activities began and continue until 2024. During this period, six different polymer injection units were installed and operated in the defined region. They were able to demonstrate that they met the specified flow rate and viscosity requirements. The flow rate is designed to accommodate a maximum capacity of 1200 barrels per day (BPD) at a pressure range of 0 to 1800 PSIG. Method,Procedure, and Process To sum up, the S1 region has been implementing polymer EOR since 2019. The EOR package unit includes a polymer preparation skid, maturation tank, polymer transfer pump (PCP), high pressure polymer injection pump (HP), static mixer, and dilution water booster pump. Off-skid facilities, including a filter, strainer toilet, and utility tank skid were also developed and established as well as an EOR polymer injection line. Each EOR device is capable of modifying the final solution polymer injection rates to match the requirements of diverse locales. For instance, some sites have a subsurface requirement of lower viscosity, such as 23cP, whereas others have different requirements. In case that the viscosity is higher like 40 cP, the project will design and deliver thorough coverage of the injection condition on site as the condition will be relocated once the injection is finished. The unit is authorized to be constructed and be able to remove upon the completion of three years of production period. All of the equipment is stored in the standard container, and the lifting lug is also included in the equipment at the skid. The Ping well supplies the water, which undergoes purification before it enters the unit. The water leaves by two separate routes: 1) To obtain the mother solution which requires the flowrate of approximately 3500 BPD; this stream is going to mixing equipment and go to maturation tank; 2) To adequately dilute with polymer before injecting into the well, the required flowrate is 1,500 - 9,500 BPD; this stream will then mix with the mother solution from the HP pump at the upstream of the static mixer and then mix according to the specified ratio between the mother solution and water. A mixture of water and polymer powder is stirred in a maturation tank to generate the mother solution. The ratio of water to polymer powder was determined and blended in a polymer preparation skid that featured a storage silo, a conveyor, and mixing machinery. The concentration of the mixture ranged from 3,000 to 10,000 ppm. After that, a PCP pump transfers the fluid to a high-pressure injection pump (HP pump), which operates at a variable speed. The PCP pump can transport a maximum of 1834 BPD (3x50%), but the HP injection system can manage a flowrate of approximately 33.33 to 330.3 BPD with variable speed drive (VSD). The operator can utilize the HMI panel to alter the ratio of final solutions to polymer preparation. The final solution injections range between 2,000 and 10,000 BPD. Before going to the well, the mixture is mixed in a static mixer that can handle between 200 and 1,200 BPD. See Tables 1 and 2 for more details.