估计
计算机科学
成本估算
能量(信号处理)
建筑工程
可靠性工程
工程类
系统工程
数学
统计
作者
Kona Venkatesh,Suryanarayana Ch,Venkat Lute,Durga Chaitanya Kumar Jagarapu
摘要
Construction sector is one of the major industrial sectors in India. Developing a 3D model-based Building Information Modeling (BIM) has become the practice for accelerating the construction process in recent years. BIM model provides solution for the Architecture, Engineering, and Construction (AEC) industry to overcome the difficulties of effective planning, scheduling and cost estimation, depending on the 2D drawings and project management tools. Due to global warming and energy crisis, the performance of a building’s energy analysis has become an important factor in meeting the building regulations. This requires integration of energy analysis phase into the design phase of the building in order to predict the energy use of the building and plan for appropriate alternative energy conservation measures. In the present study, BIM basedmodel analysis of aG+5 Residential building locatedat Kakinada in Andhra Pradesh is performed using Autodesk Navis-works to visualize the cost, time and percentage of work in the form of graphical 3D model called 5D BIM. Similarly, theelectrical energy analysis of this building for a life span of 30 years is computed by using Autodesk Green Building Studioconsidering the effect of orientation of the building. Energy optimized methods such as photovoltaic system and window wall ratio (WWR) also adopted in this study.
科研通智能强力驱动
Strongly Powered by AbleSci AI