Marlim and Voador Fields Revitalization Project

计算机科学
作者
Manoel Tavares de Paula,Daniel Henriques Mesquita Lage,A. B. dos Santos,Carlos Alexandre Pedrosa,Gisele Barata da Silva,L. H. da Fonseca,M. G. R. Cordeiro,Thiago Camanho da Costa,Ricardo Pereira,Tatyana Alessandra de Miranda
出处
期刊:Offshore Technology Conference 被引量:4
标识
DOI:10.4043/35457-ms
摘要

Abstract The purpose of this paper is to present an overview of Marlim and Voador Fields Revitalization Project, highlighting features and main achievements so far in the context of Campos Basin redevelopment. It presents a case study of Marlim and Voador Fields Revitalization Project, which includes two mature fields that were discovered in the 80's, in the east portion of Campos Basin offshore Brazil, located on the north coast of Rio de Janeiro State, around 110 km off Cape São Tomé. The start of oil production and water injection occurred in the 90's. On these fields there are several reservoirs of different lithologies and geologic ages, including post-salt sandstones and pre-salt carbonate. The main purpose of Marlim and Voador fields revitalization is to renew the production systems by means of decommissioning 9 existing platforms and install two new FPSO. Therefore, it is expected to achieve the following goals: to extend fields’ productive life from 2025 to 2048, to reduce production and operating costs, to comply with HSE current regulations, to reduce carbon footprint and to increase recovery factor by 10%. The scope of the revitalization project involves installation of two new chartered FPSO, with 150,000 bpd of oil production total maximum capacity, producing a total of 72 post-salt and 3 pre-salt wells, including 61 re-used and 14 new wells. It includes, also, installation of new subsea facilities encompassing around 660 km of flexible production lines, 15 subsea manifolds and two new gas export pipelines. The first oil production of the project was in 2023, at first with FPSO Anna Nery, and then with FPSO Anita Garibaldi. It is expected to reach the oil production peak of 150,000 bpd, in 2026, when both FPSO will be producing at their plateau maximum capacity. As the first large revitalization project in Brazil, it faced several challenges and it is considered as a pioneer in many areas, what will help future mature fields’ project development.

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
PDF的下载单位、IP信息已删除 (2025-6-4)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
exosome完成签到,获得积分10
刚刚
张泡芙完成签到 ,获得积分10
2秒前
XXX应助科研通管家采纳,获得30
4秒前
李爱国应助科研通管家采纳,获得10
4秒前
Akim应助科研通管家采纳,获得10
4秒前
打卡下班应助科研通管家采纳,获得10
4秒前
4秒前
老阎应助科研通管家采纳,获得30
4秒前
打卡下班应助科研通管家采纳,获得10
4秒前
搜集达人应助科研通管家采纳,获得10
5秒前
我是老大应助科研通管家采纳,获得10
5秒前
冬凌草应助科研通管家采纳,获得10
5秒前
共享精神应助科研通管家采纳,获得10
5秒前
打卡下班应助科研通管家采纳,获得10
5秒前
充电宝应助科研通管家采纳,获得50
5秒前
FashionBoy应助Dr.coco采纳,获得10
5秒前
打卡下班应助科研通管家采纳,获得10
5秒前
5秒前
5秒前
5秒前
planto完成签到,获得积分10
5秒前
你倒是发啊完成签到,获得积分10
6秒前
WYZ完成签到,获得积分10
6秒前
8秒前
过时的画板完成签到 ,获得积分10
9秒前
Tina_lai完成签到 ,获得积分10
9秒前
10秒前
冠鞍发布了新的文献求助10
11秒前
不会游泳完成签到,获得积分10
12秒前
壮观采文完成签到,获得积分10
12秒前
张二十八发布了新的文献求助10
14秒前
dal发布了新的文献求助10
16秒前
VV完成签到,获得积分10
18秒前
研友_8K2QJZ完成签到,获得积分10
20秒前
lee完成签到,获得积分10
22秒前
ABC完成签到,获得积分10
24秒前
25秒前
褚洙完成签到,获得积分10
25秒前
tsntn完成签到,获得积分10
27秒前
科研通AI5应助xx采纳,获得10
28秒前
高分求助中
【重要!!请各位用户详细阅读此贴】科研通的精品贴汇总(请勿应助) 10000
Three plays : drama 1000
International Code of Nomenclature for algae, fungi, and plants (Madrid Code) (Regnum Vegetabile) 1000
Semantics for Latin: An Introduction 999
Robot-supported joining of reinforcement textiles with one-sided sewing heads 530
Apiaceae Himalayenses. 2 500
北师大毕业论文 基于可调谐半导体激光吸收光谱技术泄漏气体检测系统的研究 490
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 有机化学 生物化学 物理 内科学 纳米技术 计算机科学 化学工程 复合材料 遗传学 基因 物理化学 催化作用 冶金 细胞生物学 免疫学
热门帖子
关注 科研通微信公众号,转发送积分 4087073
求助须知:如何正确求助?哪些是违规求助? 3625913
关于积分的说明 11497981
捐赠科研通 3339227
什么是DOI,文献DOI怎么找? 1835811
邀请新用户注册赠送积分活动 904002
科研通“疑难数据库(出版商)”最低求助积分说明 822032