冲洗
沉积作用
沉积物
水文学(农业)
漫滩
环境科学
地质学
腐蚀
水位下降(水文)
电流(流体)
大洪水
频道(广播)
岩土工程
地貌学
地下水
工程类
哲学
内分泌学
海洋学
神学
生物
生态学
医学
电气工程
含水层
作者
Fan Jia-hua,Gregory L. Morris
标识
DOI:10.1061/(asce)0733-9429(1992)118:3(370)
摘要
During the past 30 years, China has implemented structural and operational procedures to maximize sediment discharge from the impounded reaches of rivers, thereby reducing, arresting, or reversing reservoir sedimentation at many sites. Hydraulic methods used in China to preserve capacity are outlined in this paper, including sediment routing during floods, sediment flushing during floods, emptying and flushing, and density current venting. A method to compute retrogressive erosion during the drawdown of a reservoir is developed, and an approximate method for estimating the amount of sediment that can be vented from a reservoir as a density current is proposed. The computed values are compared with field data. Field data on the floodplain slope formed during flood season and the bottom slope of the main channel formed during nonflood season are analyzed. Empirical formulas for both slopes are presented for estimating long‐term storage capacity.
科研通智能强力驱动
Strongly Powered by AbleSci AI