条形图
施工前服务
运营管理
施工管理
成本超支
控制(管理)
挣值管理
描述性统计
项目管理
饼图
文档
质量(理念)
工程类
统计过程控制
成本工程
数据收集
业务
成本会计
建筑业
项目管理三角形
计算机科学
建筑工程
OPM3
经济
会计
管理
土木工程
数学
统计
哲学
操作系统
认识论
程序设计语言
系统工程
过程(计算)
作者
Olajide Julius Faremi,Olabode Emmanuel Ogunsanmi,Iniobong Beauty John
摘要
The quest of construction project stakeholders is effective control of cost and time. Accomplishing this quest however, remains a difficult task. This study examines factors affecting cost and time control of construction projects with a view to proposing recommendations that could assist stakeholders to achieve enhanced cost and time performance of construction projects. A survey of professionals managing construction projects in Lagos, Nigeria was conducted. Structured questionnaire was developed and administered to eighty (80) managers of construction projects who were randomly selected from a sample frame of One-hundred (100) construction project contractors. A total of fifty-two (52) questionnaires were retrieved representing 62% response rate. Using Statistical Package for Social Sciences, version 20.0, descriptive and inferential statistical tools including, bar chart, mean, minimum and maximum values, frequency tables, T-test and Analysis of Variance (ANOVA) were employed to analyse collected data. The results of the analysis revealed that the top three significant factors affecting cost and time control of construction projects are; design and documentation issues, poor labour productivity and financial resource management. This study recommends the avoidance of poor work quality in construction activities. Also, project and construction managers should focus on project tripod constraints of cost, quality and time while workers hired and deployed on construction projects should be adequately skilled in order to achieve desired cost and time performance.
科研通智能强力驱动
Strongly Powered by AbleSci AI