钻孔
煤矿开采
排水
甲烷
半径
钻探
石油工程
煤
采矿工程
岩土工程
地质学
工程类
废物管理
机械工程
生物
计算机科学
计算机安全
生态学
作者
Kai Wang,Zhen Lou,Guoying Wei,Weidong Lu,Feng Du,Binbin Qin
标识
DOI:10.1080/15567036.2019.1607933
摘要
Coal mine methane (CMM) drainage is an effective method to curb the occurrence of coal and gas outburst and gas explosion, to reduce the amount of greenhouse gas emission, and to make full use of the clean energy(methane). Sealing in-seam horizontal boreholes plays a vital role in CMM drainage. Reasonable sealing length is an important factor to achieve high extraction efficiency and reduce the cost of construction. To determine the minimum reasonable sealing length of drainage boreholes, the radius of the fracture zone was obtained based on the ideal elastoplastic model, and this radius was taken as the minimum sealing length. The influencing factors of the minimum sealing length were analyzed and engineering verification test was taken in Zhongmacun mine in Henan province, China. The research results show that the minimum reasonable sealing length should be longer for a larger radius of the coal roadway and the coal seam with a deeper buried depth, while the minimum reasonable sealing length can be shortened with the increase of uniaxial compressive strength and the supporting stress of the coal roadway. The 11.07 m of sealing length calculated by theories was basically consistent with the 12 m of sealing length verified by the method of drilling cuttings. The reasonableness of sealing length (12 m) was verified by the test results of methane concentration and flux within 40 days. All those outcomes can provide references for other mines to determine the minimum reasonable sealing length of in-seam boreholes for CMM drainage.
科研通智能强力驱动
Strongly Powered by AbleSci AI