护盾
不稳定性
岩土工程
复合数
地质学
拱门
参数统计
量子隧道
结构工程
面子(社会学概念)
失效机理
扰动(地质)
隧道掘进机
扭矩
桥台
计算机模拟
颤振
理论(学习稳定性)
失效模式及影响分析
隧道施工
水洞
作者
Sen Teng,Desen Kong,Kejian Xia,Jian Shi,Mingkai Zhao
标识
DOI:10.1139/cgj-2025-0444
摘要
Accurately predicting tunnel face stability during shield tunneling in composite strata remains a significant challenge due to the pronounced heterogeneity and contrasting mechanical behaviors of stratified geological formations. To address this issue, this study establishes a refined coupled FDM–DEM numerical model of a tunnel boring machine (TBM), capable of realistically capturing the excavation-induced disturbance process. A parametric study was conducted to evaluate the effects of the composite ratio and the chamber fill ratio on tunnel face behavior, including failure zone development, TBM thrust, and torque evolution. The results indicate that tunnel face instability evolves through a typical three-stage process: initial disturbance, failure development, and failure propagation with arch reformation. The extent of failure is positively correlated with the composite ratio and negatively correlated with the chamber fill ratio. A higher composite ratio amplifies disturbance effects due to increased exposure to weaker strata, while greater chamber fill enhances face support and suppresses failure propagation. These findings enhance the understanding of tunnel face failure mechanisms in composite strata and support the rational design of shield tunneling parameters under complex geological conditions.
科研通智能强力驱动
Strongly Powered by AbleSci AI