石膏
磷酸
烟气脱硫
冶金
材料科学
熔渣(焊接)
硬化(计算)
废物管理
复合材料
工程类
图层(电子)
作者
Yu Liu,Jiahao Yang,Feng Zhao
出处
期刊:Key Engineering Materials
日期:2022-04-25
卷期号:918: 129-134
摘要
Building gypsum has the disadvantage of short setting time and fast hardening characteristics. Based on the systematic experiments, a combined retarding system of phosphoric acid modified steel slag (3%, gypsum-based) and protein-based material (Sika 200P 0.005%, gypsum-based) is proposed. The initial setting time of gypsum is prolonged to 206 min and the final setting time is 221 min. The retarding effect for desulfurization building gypsum is significantly better than Sika 200P, and the cost is greatly reduced.
科研通智能强力驱动
Strongly Powered by AbleSci AI