数学优化
电力系统
风力发电
计算机科学
理论(学习稳定性)
离散化
电力系统仿真
过程(计算)
校准
电
自动频率控制
控制理论(社会学)
频率响应
工程类
线性规划
可靠性工程
稳健优化
固有频率
尺寸
动态规划
船员
分解
能量(信号处理)
天然气
发电
经济调度
随机规划
作者
Yuqi Zhang,Chuan He,Xuan Liu,Ziqi Hu,Lu Nan,Tianqi Liu,Lei Wu
标识
DOI:10.1109/tpwrs.2025.3615480
摘要
Frequent natural disaster promotes the critical importance of coordinating the restoration of integrated gas and electricity distribution systems (IGEDSs). A bi-level frequency calibration framework of IGEDS is proposed in this paper to ensure frequency stability, where a multi-stage optimal restoration problem with a dynamic discretized frequency reserve model is solved in the upper level, and time-domain simulation is conducted to check frequency stability and frequency reserve utilization of DGs/ WTs in the lower level. Specifically, the multi-stage optimal restoration problem optimizes the total operation cost during the restoration process utilizing repair crew dispatch, line pack of gas pipeline, gas storage, power-to-gas (P2G), and frequency reserve of distributed generators (DGs)/ wind turbines (WTs), while considering both nonanticipativity constraints of outage uncertainty and distributionally robust constraints of energy uncertainty. Moreover, an improved decomposition and nested progressive hedging (ID&NPH) algorithm is presented to solve the proposed model. Numerical analysis indicates that the proposed model could effectively improve the load restoration of IGEDS under extreme disasters.
科研通智能强力驱动
Strongly Powered by AbleSci AI