能源规划
功率(物理)
电力系统
能量(信号处理)
工程类
可再生能源
电气工程
物理
统计
数学
量子力学
作者
Lin Shao,Ruxiang Ma,Hongbing Shi,Tiantian Wei,Haiteng Han
标识
DOI:10.1109/ispec53008.2021.9735471
摘要
As the prefecture-level city with the largest area, the widest sea area, and the longest coastline in Jiangsu Province, Yancheng is the frontier for promoting the province's energy transformation and accelerating energy reform. The construction of a new power system with new energy as the main body is the essential guarantee of Yancheng's achievement to "carbon emission peak and carbon neutrality". This paper analyzes Yancheng's situation in the new power system planning with new energy as the main body on the basics of Yancheng's energy resources endowment. Then it clarifies the positioning and principles of new power system planning with new energy as the main body. It finally builds an overall structure of the new power system planning model based on Yancheng Demonstration Zone.
科研通智能强力驱动
Strongly Powered by AbleSci AI