作者
Nikolas Geroliminis,Mohsen Ramezani,Mehmet Yildirimoḡlu,Paul Anderson
摘要
This project is a natural next stage of earlier successfully completed projects for efficient traffic management schemes for Swiss freeways. Based on OFROU recommendations, we explore alternatives for developing the next generation of ramp metering strategy to address limitations of widely applied existing strategies, and substantially enhance the performance of the current traffic situation in the freeway system. Following a different approach, we develop a new coordinated ramp strategy with variable speed limits by fo-cusing on densities and flows obtained by loop detector measurements. While ramp metering is a widely-accepted strategy for congestion alleviation, in case of high demand inequity issues arise, as travelers at the on-ramps experience significantly higher delays than those in the mainline. Also, in case of short length on-ramps, long queues can spillback in the arterial network and create significant delays in urban streets. Both characteristics are highly present in Swiss freeway roads, which make the imple-mentation of isolated metering not a very efficient solution in many cases. Given the Swiss high standards for travel time reliability and efficiency, there is a need for new traf-fic management strategies, which will allow freeways to move Swiss people at high flows and with small probability of breakdown. This research project seeks innovative and prac-tical traffic control strategies integrating coordinated ramp metering and variable speed limit (VSL). During the first part of the project, A1 freeway from Lausanne to Geneva was selected for the data collection. Given the limited data available from the loop detectors, two addition-al sources were utilized: data of manual counts at the arterials next to the on-ramps of Nyon and Coppet were collected by 10 EPFL MSc students and data from two high reso-lution cameras installed at the merge location of Coppet and Nyon ramps. The available dataset consists of five different types of source; mainline detectors (a single detector be-tween two successive interchanges), manual counts at the interchanges (Nyon and Cop-pet), ramp detectors at three interchanges (Coppet, Nyon, and Gland), detectors from variable speed limit (VSL) system, ramp detectors, and the video camera located at Nyon and Coppet sites, covering the Geneva direction. Given that data from each source has different characteristics and different formats, a cleaning and mining process was initially developed. The results from different sources have been put together to select a repre-sentative congested day and to create the demand profile. The second part of the project developed a dynamic zone-based coordinated ramp me-tering algorithm with variable speed limits considerations to treat all freeway and urban users in an equitable way. The whole freeway system is divided into zones, where the length of each zone is dynamic and is estimated in real-time. Within each zone the meter-ing rates are chosen independently of conditions in other zones. The algorithm's goal is to keep the car density levels at all ramps below the congestion thresholds and not to al-low low speeds to occur in the mainline, by constraining the ramp delays. The ramp rates become stricter when mainline density is close to the congestion threshold and the ramp rates increase when ramp waiting times are close to the ramp delay threshold. When it is not possible to keep both uncongested because of high on-ramp and mainline demands, the algorithm seeks to delay as further as possible the violation of both thresholds by uti-lizing the spare storage capacity of on-ramps in the proximity of the active bottleneck merge location.