电池(电)
电动汽车
软件部署
汽车工程
背景(考古学)
持续时间(音乐)
充电站
计算机科学
电压
动态规划
工程类
功率(物理)
储能
模拟
电气工程
物理
文学类
艺术
古生物学
操作系统
生物
量子力学
算法
作者
Saeed Salimi Amiri,Shahram Jadid,Hedayat Saboori
出处
期刊:Energy
[Elsevier BV]
日期:2018-09-28
卷期号:165: 549-562
被引量:122
标识
DOI:10.1016/j.energy.2018.09.167
摘要
Abstract The rapid growth of electric vehicle (EV) penetration is promoted by fossil fuels depletion, environmental concerns, and energy efficiency initiatives. Battery charging time duration is of the main obstacles to large-scale deployment of this technology. Battery swapping station (BSS) is a new concept to handle this issue in which depleted EV batteries are replaced with a previously full-charged one at a significantly less time duration. To this end, the optimum location of the EV charging among BSSs in the network in addition to the priority charging of the depleted batteries in each BSS should be determined. In this context, the present paper is to perform these tasks optimally and simultaneously. The problem is formulated as a multi-objective programming model in which three non-homogenous objectives are taken into account and solved using the NSGA II algorithm. Two cost-based objectives including minimizing EV batteries charging and power loss cost along with two technical based objectives, comprising voltage profile flattening and network capacity releasing, are considered. Additionally, besides dynamic pricing scheme, a time window method to prevent interruptions in the battery charging is developed. The proposed model is implemented on 33-bus IEEE test system where the results demonstrate its functionality.
科研通智能强力驱动
Strongly Powered by AbleSci AI