The leaching process of the wulfenite from a mine in Guizhou by using the sodium hydroxide as medium is investigated,and the factors such as temperature,ratio of liquid to solid,sodium hydroxide concentration,ore particle size,leaching time on the leaching rate of molybdenum and lead are determined.The optimal leaching technological condition derived from the experimental results is 75℃ for operation temperature,2∶1 for ratio of liquid to solid,1h for leaching time, 90g/L for sodium hydroxide concentration and 80.2%-0.074mm for ore particle size.The molybdenum leaching rate is up to 94.21% and the lead dissolving rate is only 14.71% under the optimal condition.