Design for deep foundation pit dewatering of construction engineering——A case study on Xutang Electric Power Plant in Jiangsu Province
作者
Zhao Zhong-sheng
摘要
The application of the deep foundation pit dewatering engineering is an important technique to make sure of the construction safety under complex geologic conditions.Combining with the deep foundation pit dewatering projects in tipper room of Xutang in Jiangsu Province,the authors focused on the foundation pit dewatering project,obtained the dewatering volume and wells.It was concluded that the project in Xutang was accomplished with a good protecting and economical effect,providing a basis and reference for solving the dewatering problems with similar conditions.