初始化
瞬态(计算机编程)
计算机科学
变压器
电力传输
电力系统
网格
动力传输
电子工程
功率(物理)
工程类
控制理论(社会学)
电压
电气工程
物理
操作系统
量子力学
人工智能
数学
程序设计语言
控制(管理)
几何学
作者
Xujiang Chen,Xing Zhang,Tian Fang,Wei Qiu,Yiding Jin,Xueping Zhou
标识
DOI:10.1109/powercon.2018.8601660
摘要
Along with the development of UHV technology, an extra-large-scaled AC / DC hybrid power grid has been accomplished in China, the characteristics of the power system is facing profound changes, the techs of simulations are needed to be improved as well to meet the new requirements. The electromagnetic transient simulation is often used to model DC system to obtain more accurate dynamic characteristics. However, the operation status adjustment and initialization process of the EMT model of DC systems seriously affect the efficiency in simulation of AC/DC power grids. In this paper, a method of auto-initializing the electromagnetic model of DC transmission is proposed. Using the AC/DC large-scale network power flow as the boundary condition, the internal power flow solution of the DC electromagnetic model is quickly calculated, and the initial on-valves, the position of converter transformer's tap, the AC filters' switching scheme, and the control instructions are accurately determined. This solution enables the automatic initialization of the UHVDC electromagnetic model so that it can reach a predetermined steady state during the 0.5 s simulation. The method proposed in this paper realizes the fast and smooth start-up of the electromechanical-electromagnetic transient hybrid simulation with a large number of electromagnetic UHVDC models, and solves the application problems of the electromechanical-electromagnetic transient hybrid simulation in operation mode calculation and online simulation of power grid.
科研通智能强力驱动
Strongly Powered by AbleSci AI