光伏系统
太阳辐照度
储能
电池(电)
计算机科学
航程(航空)
汽车工程
光伏并网发电系统
荷电状态
功率(物理)
工程类
最大功率点跟踪
网格
电压
太阳能
环境科学
电气工程
气象学
航空航天工程
数学
量子力学
物理
逆变器
几何学
作者
Xiaomeng Ai,Jiaming Li,Jiakun Fang,Wei Yao,Hailian Xie,Rong Cai,Jinyu Wen
标识
DOI:10.1049/iet-rpg.2018.5190
摘要
The variability of solar irradiance with a high ramp rate may lead to fluctuation in the output of photovoltaic (PV) plants and burdens the power system regulations. A novel control method coordinating the solar PV plants and the battery energy storages (BES) is proposed, aiming at minimising the gap between multi-time-scale ramp of solar PV station and the grid code requirement. The proposed control method combines the computationally efficient feedback control and the mathematical optimisation. Both the short-term forecast and the historical samples are utilised to regulate the output of the PV plants and BES. The state-of-charge reference is adapted by the proposed control in real-time operation for the better performances. The necessary solar power curtailment is investigated with limited BES capacity. The effectiveness of the proposed control method is comprehensively verified by simulations based on real-world measurements of solar PV power under various BES capacity and ramp range requirements.
科研通智能强力驱动
Strongly Powered by AbleSci AI