套管
材料科学
水泥
热固性聚合物
环空(植物学)
泄漏
复合材料
石油工程
固化(化学)
泥浆
补救措施
粘度
法律工程学
热的
沥青
偏转(物理)
环氧树脂
作者
Rasho Alo,N. Amy,R. Sipangkui,F. Awang Atim,Svein Normann,N. Fidzrus,C. Jintony,Robert B. Gilbert,Md Abdul Karim,M. Asmuni,Z. Mokhtar,I. Abd Aziz,Mariyati Mohd Nor,M. Rayman
摘要
Abstract This remedial intervention was designed to address a cement packer leak in a gas-producing well that had been compromised due to channeling from a previously set cement packer. The well was initially intended to produce from a newly perforated zone following the cement packer operation; however, post-job diagnostics revealed gas migration and pressure anomalies, indicating a loss of zonal isolation caused by cement channeling. The primary objective of the intervention was to restore integrity through a targeted cement packer leak repair using a Thermosetting resin slurry. This first-time approach in the East Malaysian upstream sector was selected after considering its liquidity, which enables penetration into micro-channels of the existing cement packer. Key considerations in the design phase included downhole temperature at the casing top and across the perforated zone, since the resin system is temperature-activated and its setting behavior depends on thermal exposure. Thermosetting resin offers customization based on well conditions, with immiscibility in water, low gel strength, and controllable viscosity making it an ideal candidate for leak remediation. The resin system was pre-engineered and lab-tested, with fine-tuning of specific gravity, thermal activation thresholds, curing time, and pumpability to match the well’s operational constraints. Slurry formulation and deployment strategy were based on leak rate evaluations and injectivity tests, while consistometer testing was used to align pumping time with viscosity behavior, ensuring the slurry remained pumpable during placement and achieved the desired setting depth. A detailed case study is presented, highlighting the technical design, operational planning, and execution phases of this temperature-set resin-based remedial operation. The collaboration between the oil operator and service partners underscores the importance of joint planning, real-time adaptation, and engineered solutions, with lessons learned providing valuable insights for future remedial cement packer.
科研通智能强力驱动
Strongly Powered by AbleSci AI