U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

聚变能 橡树岭国家实验室 核工程 中子 中子源 融合 核聚变 环境科学 核物理学 计算机科学 物理 工程类 等离子体 语言学 哲学
作者
Brian Egle,P.D. Ferguson,James White
标识
DOI:10.2172/1649392
摘要

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
刚刚
刚刚
yuxuan发布了新的文献求助10
1秒前
小胡完成签到,获得积分10
1秒前
二胡儿完成签到,获得积分10
2秒前
小兵完成签到,获得积分10
2秒前
2秒前
zwjay发布了新的文献求助10
2秒前
sanhe发布了新的文献求助10
2秒前
Orange的应助被2104采纳,获得10
3秒前
科研通AI6.4的应助被茶壶喝茶采纳,获得10
3秒前
vv完成签到,获得积分20
3秒前
123发布了新的文献求助10
3秒前
kuan发布了新的文献求助10
4秒前
Yzh发布了新的文献求助10
4秒前
5秒前
5秒前
小美完成签到 ,获得积分10
5秒前
传奇3的应助被MICO002采纳,获得10
6秒前
顾矜的应助被weixuefeng采纳,获得10
7秒前
新新发布了新的文献求助10
7秒前
寒尽春生关注了科研通微信公众号
7秒前
8秒前
9秒前
昌怜烟完成签到,获得积分10
9秒前
春樹暮雲完成签到 ,获得积分10
9秒前
YuJiaxing关注了科研通微信公众号
10秒前
Winnie发布了新的文献求助30
11秒前
Jasper的应助被投稿必中的喜采纳,获得10
11秒前
Hello的应助被多多采纳,获得10
11秒前
12秒前
单薄的绮兰完成签到 ,获得积分10
12秒前
田様的应助被飘逸的誉采纳,获得30
13秒前
wanci的应助被鸭肉采纳,获得10
13秒前
14秒前
14秒前
14秒前
香蕉觅云的应助被Nefilibata采纳,获得30
14秒前
啦啦啦发布了新的文献求助10
15秒前
农民饭发布了新的文献求助20
16秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
拉伸高分子熔体中缠结行为的模拟和小角中子散射研究 2000
Handbook of Sport Coaching Research 1000
Orthognathic Surgery - 2 Volume Set 500
高分子基功能界面水蒸发材料与应用研究 500
外场增强的水汽发电研究 500
基于结构调控的功能化水诱导发电材料与器件研究 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 计算机科学 工程类 有机化学 化学工程 生物化学 物理 复合材料 内科学 催化作用 光电子学 人工智能 细胞生物学 无机化学 物理化学 数学
热门帖子
关注 科研通微信公众号,转发送积分 8199032
求助须知:如何正确求助?哪些是违规求助? 9584351
关于积分的说明 21893854
捐赠科研通 7800667
什么是DOI,文献DOI怎么找? 3439113
关于科研通互助平台的介绍 2562127
邀请新用户注册赠送积分活动 2486091