火车
码头
结构工程
磁道(磁盘驱动器)
大梁
桥(图论)
工程类
外倾角(空气动力学)
旋转(数学)
结算(财务)
计算机科学
机械工程
医学
地图学
人工智能
内科学
地理
万维网
付款
作者
Hongye Gou,Chang Liu,Hui Hua,Yi Bao,Qianhui Pu
标识
DOI:10.1177/1077546320936899
摘要
Deformations of high-speed railways accumulate over time and affect the geometry of the track, thus affecting the running safety of trains. This article proposes a new method to map the relationship between dynamic responses of high-speed trains and additional bridge deformations. A train–track–bridge coupled model is established to determine relationship between the dynamic responses (e.g. accelerations and wheel–rail forces) of the high-speed trains and the track deformations caused by bridge pier settlement, girder end rotation, and girder camber. The dynamic responses are correlated with the track deformation. The mapping relationship between bridge deformations and running safety of trains is determined. To satisfy the requirements of safety and riding comfort, the suggested upper thresholds of pier settlement, girder end rotation, and girder camber are 22.6 mm, 0.92‰ rad, and 17.2 mm, respectively. This study provides a method that is convenient for engineers in evaluation and maintenance of high-speed railway bridges.
科研通智能强力驱动
Strongly Powered by AbleSci AI