采购
组分(热力学)
产品(数学)
提前期
钥匙(锁)
随机规划
计算机科学
订单(交换)
供应链
运筹学
供求关系
数学优化
运营管理
业务
工程类
经济
数学
微观经济学
营销
物理
几何学
热力学
计算机安全
财务
作者
Ramesh Bollapragada,Saravanan Kuppusamy,Uday S. Rao
标识
DOI:10.1080/00207543.2014.951522
摘要
In this paper, we examine a multi-product, multi-component, procurement and assembly problem with both supply and demand uncertainties. We explicitly model the uncertainty using a stochastic program that facilitates procurement and assembly decisions. We present a stochastic linear programming model of the problem which we solve using its deterministic equivalent with a finite number of scenarios. We show that the systems performance, i.e. total cost, depends on the order lead time, L, and the assembly lead time Q, only through their sum . We illustrate the impact of on system performance with numerical experiments. Also, we illustrate that, in some cases, increasing supplier capacity can worsen system performance. In addition, we identify the key cost drivers that need attention from managers in the manufacturing industry, when there is limited knowledge of future demand and component availability.
科研通智能强力驱动
Strongly Powered by AbleSci AI