Took Bao steel Zhanjiang iron and steel base project 2×15000 tons/day of thermal seawater desalination project as an example.Introduced the low-temperature multi effect seawater desalination, the advantages and evaporator device installation key steps, and emphasized the evaporator device in construction matters needing attention.