生物修复
环境科学
地下水
受污染的地下水
硝酸盐
污染
环境工程
地下水污染
废物管理
地下水污染
环境修复
环境化学
工程类
化学
含水层
生态学
生物
岩土工程
有机化学
作者
Alba Ceballos‐Escalera,Narcís Pous,Lluís Bañeras,Maria Dolors Balaguer,Sebastià Puig
出处
期刊:Water Research
[Elsevier BV]
日期:2024-04-15
卷期号:256: 121618-121618
被引量:37
标识
DOI:10.1016/j.watres.2024.121618
摘要
The potential of nitrate electro-bioremediation has been fully demonstrated at the laboratory scale, although it has not yet been fully implemented due to the challenges associated with scaling-up bioelectrochemical reactors and their on-site operation. This study describes the initial start-up and subsequent stable operation of an electro-bioremediation pilot plant for the treatment of nitrate-contaminated groundwater on-site (Navata site, Spain). The pilot plant was operated under continuous flow mode for 3 months, producing an effluent suitable for drinking water in terms of nitrates and nitrites (<50 mg NO 3 - L -1 ; 0 mg NO 2 - L -1 ). A maximum nitrate removal rate of 0.9 ± 0.1 kg NO 3 - m -3 d -1 (efficiency 82 ± 18 %) was achieved at a cathodic hydraulic retention time (HRT cat ) of 2.0 h with a competitive energy consumption of 4.3 ± 0.4 kWh kg -1 NO 3 - . Under these conditions, the techno-economic analysis estimated an operational cost of 0.40 € m -3 . Simultaneously, microbiological analyses revealed structural heterogeneity in the reactor, with denitrification functionality concentrated predominantly from the centre to the upper section of the reactor. The most abundant groups were Pseudomonadaceae, Rhizobiaceae, Gallionellaceae , and Xanthomonadaceae . In conclusion, this pilot plant represents a significant advancement in implementing this technology on a larger scale, validating its effectiveness in terms of nitrate removal and cost-effectiveness. Moreover, the results validate the electro-bioremediation in a real environment and encourage further investigation of its potential as a water treatment.
科研通智能强力驱动
Strongly Powered by AbleSci AI