时间范围
调度(生产过程)
遗传算法
地铁列车时刻表
衡平法
路面管理
计算机科学
数学优化
算法
工程类
运筹学
运输工程
数学
政治学
操作系统
法学
作者
Hamed Naseri,Amirhossein Fani,Amir Golroo
标识
DOI:10.1080/10298436.2020.1790558
摘要
Appropriate pavement maintenance is of great importance due to the increasing deterioration of pavements and limited resources. Nowadays, highway agencies face large-scale networks. The management of large-scale networks is a challenge concerning the computational complexity, which typically increases exponentially with the dimension of the network. Water cycle and genetic algorithms are utilised in this paper to find the optimal maintenance schedule of large-scale pavement networks. A new practical constraint is introduced in the mathematical formulation that the total annual costs should not fluctuate more than a predefined limit over the planning horizon. Moreover, a novel index is developed to calculate the equity level in pavement maintenance scheduling, and the outcomes of the algorithms are compared based on this equation. A real road network with 103 pavement sections is the case study of this paper. The results show that ‘Equity index’ is reduced by 94% and 48% during the analysis period by WCA and GA, respectively. Drawing on WCA and GA optimal solutions, the average international roughness index of the network is decreased by 35% and 31% respectively in a 5-year horizon. Moreover, the variance of the maximum and minimum allocated budget in the analysis period is less than 15%.
科研通智能强力驱动
Strongly Powered by AbleSci AI