Lv3
224 积分 2025-05-20 加入
A framework for integrated design of human–robot collaborative assembly workstations
3天前
已完结
A multi-strategy self-adaptive differential evolution algorithm for assembly hybrid flowshop lot-streaming scheduling with component sharing
10天前
已完结
Research on the balancing problem of human–robot collaborative assembly line in SMEs considering ergonomic risk and cost
19天前
已完结
Multi-objective metaheuristic approach for balancing and scheduling human-robot collaborative assembly lines with cognitive and ergonomic considerations
19天前
已完结
An integrated cost and worker fatigue evaluation model of a packaging process
26天前
已完结
Multi-objective mixed-model assembly line balancing with human–robot collaboration and fuzzy processing time
26天前
已完结
An improved multi-objective harmony search algorithm based on reinforcement learning for solving automated assembly line balancing and energy consumption optimization problems
26天前
已完结
Multi objective optimization of human–robot collaboration: A case study in aerospace assembly line
29天前
已完结
Research on the balancing problem of human–robot collaborative assembly line in SMEs considering ergonomic risk and cost
29天前
已关闭
Effective metaheuristic and rescheduling strategies for the multi-AGV scheduling problem with sudden failure
30天前
已完结