Lv2
140 积分 2024-12-01 加入
Integrated Scheduling of Automatic Guided Vehicles and Automatic Stacking Cranes in Automated Container Terminals Considering Landside Buffer Zone
2个月前
已完结
Integrated optimization of automated guided vehicles and yard cranes considering charging constraints
2个月前
已完结
Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
2个月前
已完结
Hybrid rolling-horizon optimization for berth allocation and quay crane assignment with unscheduled vessels
2个月前
已关闭
Hybrid rolling-horizon optimization for berth allocation and quay crane assignment with unscheduled vessels
2个月前
已完结
Integrated scheduling of yard cranes, external trucks, and internal trucks in maritime container terminal operation
2个月前
已完结
Meta-heuristic approaches for flowshop scheduling problems: a review
6个月前
已完结
An improved particle swarm optimization algorithm for berth allocation and time-variant quay crane scheduling problem during an emergency
7个月前
已完结
Swarm intelligence algorithms for Yard Truck Scheduling and Storage Allocation Problems
7个月前
已完结