| 标题 |
Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: an integrated ISM–MICMAC approach |
| 网址 | |
| DOI | |
| 其它 |
期刊:Engineering, Construction and Architectural Management 作者:Cheng Fan; Deng Binchao; Yilin Yin 出版日期:2022 |
| 求助人 | |
| 下载 |
PDF的下载单位、IP信息已删除
(2025-6-4)