Will Gorman,Julie Mulvaney-Kemp,Joseph Rand,Joachim Seel,Ryan Wiser,Nick Manderlink,Fredrich Kahrl,Kevin R. Porter,Will Cotton
出处
期刊:Joule
[Elsevier BV]
日期:2024-12-06
卷期号:9 (2): 101791-101791
被引量:30
标识
DOI:10.1016/j.joule.2024.11.008
摘要
Summary
Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.
科研通智能强力驱动
Strongly Powered by AbleSci AI