A Comparison of the Project Management Methodologies PRINCE2 and PMBOK in Managing Repetitive Construction Projects

项目管理 项目组 项目策划 工程管理 项目计划 工程类 项目管理三角形 过程管理 项目经理 平面图(考古学) 施工管理 OPM3 项目管理 系统工程 业务 土木工程 考古 营销 历史 采购
作者
Aivaras Simonaitis,Mindaugas Daukšys,Jūratė Mockienė
出处
期刊:Buildings [Multidisciplinary Digital Publishing Institute]
卷期号:13 (7): 1796-1796 被引量:2
标识
DOI:10.3390/buildings13071796
摘要

Nowadays, companies employ various project management (PM) methodologies to ensure that their projects are effective and successful. It is worth knowing that differences in principles and processes of PM methodologies influence the use of different PMs in managing non-repetitive and repetitive construction projects. This paper presents the selection and application of a rational construction PM methodology to a repetitive construction project after a comparison of two PM methodologies, namely Project Management Body of Knowledge (PMBOK) and Projects IN Controlled Environments (PRINCE2). The object of this study is a repetitive anti-corrosion works project for steel structures conducted at Company X. The research was carried out in two steps. First, a quantitative survey of the respondents from companies involved in the management and execution of construction projects was conducted with the aim to identify a rational approach to construction PM. The questionnaire consisted of fourteen closed-ended questions, six of which were generic and eight were PMBOK- and PRINCE2-specific questions. Companies that took part in the quantitative study identified the PRINCE2 project management approach as the most suitable for managing a repetitive construction project. Using the PRINCE2 PM methodology, the repetitive construction project would aim to provide as much information as possible to the project participants, form a team and assign team leaders responsible for the phases, establish a financial plan, a detailed timetable for the execution of the works, a quality control plan, and a plan of responsible persons, and detail the technological sequencing of the works. Second, a quantitative study on the selection of a rational construction project management approach for a repetitive construction project was pursued, and a qualitative assessment of construction project monitoring trends and actions was conducted. The qualitative research was performed using a structured interview method and asking the representatives of different companies X, Y, and Z the same 15 questions. The results of the qualitative research showed that a successful PM depends on the size of the project team, the PM tools and methodologies used, the PM philosophy, and the frequency of monitoring and discussing the project progress.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
刚刚
传奇3应助munibai采纳,获得10
刚刚
刚刚
1秒前
柳芷汐完成签到,获得积分10
2秒前
2秒前
2秒前
2秒前
李某人完成签到,获得积分10
2秒前
汤姆发布了新的文献求助10
2秒前
YY发布了新的文献求助10
2秒前
kevin发布了新的文献求助10
3秒前
喜气洋洋完成签到 ,获得积分10
3秒前
3秒前
ma发布了新的文献求助10
3秒前
3秒前
秉烛夜游完成签到,获得积分10
3秒前
自由万声发布了新的文献求助10
4秒前
土豆发布了新的文献求助10
5秒前
稳重蜗牛发布了新的文献求助10
5秒前
ding应助Xin采纳,获得10
5秒前
Raymond完成签到 ,获得积分10
5秒前
Trouvaille发布了新的文献求助50
5秒前
6秒前
Yuan完成签到,获得积分0
6秒前
6秒前
7秒前
充电宝应助Accept采纳,获得10
7秒前
赘婿应助三月繁花采纳,获得10
7秒前
7秒前
科研通AI6.3应助高玉峰采纳,获得10
7秒前
汉堡包应助不安蜜蜂采纳,获得10
8秒前
花开富贵完成签到,获得积分10
8秒前
田小蛋糕发布了新的文献求助10
8秒前
萝卜花发布了新的文献求助30
8秒前
LMHAL发布了新的文献求助10
8秒前
8秒前
zz发布了新的文献求助10
9秒前
海带拳大力士完成签到,获得积分10
9秒前
9秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Chemistry and Physics of Carbon Volume 18 800
The Organometallic Chemistry of the Transition Metals 800
Leading Academic-Practice Partnerships in Nursing and Healthcare: A Paradigm for Change 800
The formation of Australian attitudes towards China, 1918-1941 640
Signals, Systems, and Signal Processing 610
全相对论原子结构与含时波包动力学的理论研究--清华大学 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 物理 内科学 复合材料 催化作用 物理化学 光电子学 电极 细胞生物学 基因 无机化学
热门帖子
关注 科研通微信公众号,转发送积分 6432143
求助须知:如何正确求助?哪些是违规求助? 8247821
关于积分的说明 17541082
捐赠科研通 5489293
什么是DOI,文献DOI怎么找? 2896490
邀请新用户注册赠送积分活动 1873020
关于科研通互助平台的介绍 1713159