失效模式及影响分析
风险分析(工程)
风险评估
比例(比率)
过程(计算)
大流行
模式(计算机接口)
计算机科学
模糊逻辑
风险管理
2019年冠状病毒病(COVID-19)
业务
运营管理
过程管理
运筹学
工程类
可靠性工程
地理
疾病
人工智能
医学
计算机安全
传染病(医学专业)
财务
病理
操作系统
地图学
作者
Ru Liang,Zhenzhen Xue,Heap‐Yih Chong
出处
期刊:Journal of the Construction Division and Management
[American Society of Civil Engineers]
日期:2022-11-03
卷期号:149 (1)
被引量:9
标识
DOI:10.1061/(asce)co.1943-7862.0002430
摘要
Logistics parks served as critical logistics facilities during the coronavirus disease 2019 pandemic. Constructing these large-scale projects including their subsequent operations involved unusual risk factors that required comprehensive risk evaluations. Therefore, it is vital to examine the potential risk factors across the entire life cycle of these projects in accordance with the complexity of these large-scale logistics park projects (LLPPs) during the pandemic. This study proposes a new risk analysis model that evaluates a comprehensive list of risk factors based on the failure mode and effects analysis (FMEA). The hesitant uncertain linguistic Z-numbers (HULZNs) and fuzzy C-means (FCM) clustering algorithm are incorporated into the FMEA model to evaluate the risk. The practicability of the model was assessed in a case study. The findings identified and distinguished risk factors based on their levels of influences and priorities in dealing with uncertainties during the decision-making process in LLPPs. The FMEA model’s new methodological assessment also contributes to the efficient risk evaluation process through its more reliable and reasonable failure mode risk clustering, particularly for complex group decision-making environments during the pandemic.
科研通智能强力驱动
Strongly Powered by AbleSci AI