Managing material shortages in project supply chains: Inventories, time buffers, and supplier flexibility

供应链 业务 订单(交换) 产业组织 提交 计算机科学 营销 财务 数据库
作者
Panos Kouvelis,Xingxing Chen,Yu Xia
出处
期刊:Production and Operations Management [Wiley]
卷期号:32 (11): 3717-3735 被引量:17
标识
DOI:10.1111/poms.14059
摘要

We consider a two‐stage project supply chain with a downstream project firm producing an engineer‐to‐order (ETO) complex product or a make‐to‐order (MTO), low‐volume, customized industrial product as a project, and an upstream contract supplier supplying a key material to the project. The project faces two uncertainties: project activity time uncertainty and material consumption uncertainty, which may be positively or negatively correlated. In anticipation of these uncertainties, the project firm has to carefully decide its promised project due date to its project customer, against which harsh penalties will be assessed, and his material order quantity to commit to the contract supplier in advance. In most practical settings, project firms order from contracted suppliers via a flexible wholesale price contract consisting of a discounted advance order price and a risk‐premium adjusted expedite order price. The discounted advance order price encourages the project firm to take more inventory risk in the supply chain, and the expedite order price incentivizes the supplier to bear more inventory risk by carrying safety stock in excess of the project firm's advance material order. We formulate an optimization model that solves the project firm's project due date and material order problem, which takes into account the supplier's strategic reaction to the project firm's material order under the flexible wholesale price contract. We show that for MTO projects, risk‐sharing with suppliers on project materials is less important to the project firm, with the project firm assuming ownership of all material inventory in the channel and setting a deliberate project due date being the key. On the other hand, for ETO projects, risk‐sharing with contracted suppliers assumes critical importance. Project firms managing ETO projects should fully exploit the flexibility in the material supply contract to optimally drive the supplier's safety stock level and set the project due date reflecting the shared risk in the supply chain.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
忧伤的白萱完成签到,获得积分10
1秒前
1秒前
1秒前
hzy完成签到 ,获得积分10
1秒前
高瑞航完成签到,获得积分10
2秒前
2秒前
3秒前
3秒前
4秒前
5秒前
5秒前
zhang完成签到,获得积分10
5秒前
机智茗茗的应助被暮云春树采纳,获得30
5秒前
6秒前
6秒前
7秒前
KeaRpro的应助被sufu_jony采纳,获得10
7秒前
安静的睫毛完成签到,获得积分10
8秒前
8秒前
星空完成签到,获得积分10
8秒前
9秒前
优美宛凝发布了新的文献求助10
9秒前
田様的应助被东起欧采纳,获得10
10秒前
JorenLu发布了新的文献求助10
10秒前
11秒前
西班牙拿铁完成签到,获得积分10
12秒前
guoxingliu发布了新的文献求助10
12秒前
12秒前
亐枧发布了新的文献求助10
13秒前
在水一方的应助被优美芝采纳,获得10
14秒前
14秒前
nini完成签到,获得积分10
14秒前
情怀的应助被hyl采纳,获得10
15秒前
我要增肌发布了新的文献求助10
15秒前
文静芷蕊发布了新的文献求助10
16秒前
Qiu发布了新的文献求助10
17秒前
小t要读top博完成签到,获得积分10
18秒前
18秒前
Ava的应助被zhou采纳,获得10
19秒前
正直千青完成签到,获得积分10
19秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Encyclopedia of Modern Artificial Intelligence 1000
Особенности технологий и методов информационно-психологических войн СССР с Великобританией и США в период 1939-1953 гг 1000
Das Matthäusevangelium: Kapitel 1:1–17 1000
IRTSD: Open-Source Data and Toolset for Electromagnetic Transient Analysis of Disturbances and IBR Control Malfunctions in Transmission Systems 1000
Analyses de reconnaissances de dettes passées devant les échevins d'Ypres (1249-1291) 600
拉伸高分子熔体中缠结行为的模拟和小角中子散射研究 600
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 计算机科学 工程类 有机化学 化学工程 生物化学 物理 复合材料 内科学 催化作用 光电子学 人工智能 细胞生物学 无机化学 物理化学 数学
热门帖子
关注 科研通微信公众号,转发送积分 8134362
求助须知:如何正确求助?哪些是违规求助? 9535889
关于积分的说明 21614923
捐赠科研通 7716941
什么是DOI,文献DOI怎么找? 3419197
关于科研通互助平台的介绍 2544569
邀请新用户注册赠送积分活动 2460746