计算机科学
数学优化
稳健优化
稳健性(进化)
地铁列车时刻表
调度(生产过程)
本德分解
基线(sea)
数学
生物化学
基因
海洋学
操作系统
地质学
化学
作者
Noemie Balouka,Izack Cohen
标识
DOI:10.1016/j.ejor.2019.09.052
摘要
This paper suggests a robust optimization approach for the multi-mode resource-constrained project scheduling problem with uncertain activity durations. The objective is to minimize the worst-case project duration by deciding on activity modes, resource allocations and a schedule baseline. The problem is solved by a Benders decomposition approach with specialized cuts. We consider polyhedral uncertainty sets in which the level of conservatism can be adjusted. Using a computational study in which various problem instances are explored under varying levels of uncertainty, conservatism and several types of duration distributions, we provide insights about the price of robustness and the performance of the approach. The hope is that these insights can guide future multi-mode project scheduling implementations when there is partial information about the distribution of activity durations.
科研通智能强力驱动
Strongly Powered by AbleSci AI