An Evaluation of the Causes and Effects of Delayed Payments on the Productivity of Construction Companies in Guyana

付款 业务 估价(财务) 认证 现金流 财务 精算学 现金 利润率 利润(经济学) 生产力 工作(物理) 运营管理 经济 工程类 管理 宏观经济学 微观经济学 机械工程
作者
Shanomae Oneka Eastman
出处
期刊:International journal of innovative research in engineering & multidisciplinary physical sciences [International Journal of Innovative Research in Engineering and Multidisciplinary Physical Sciences (IJIRMPS)]
卷期号:10 (04) 被引量:1
标识
DOI:10.37082/ijirmps.2022.v10i04.010
摘要

Delayed payments for services rendered by contractors are seen as a key problem in the construction sector. It causes significant cash flow problems, which can obliterate the contractual payment chain. The study was done to determine the causes and effects of delayed payments for works completed in the construction sector in Guyana and to ascertain the actions taken by contractors to overcome these problems. In order to obtain data for the study, a random sample of 180 contractors, consultants, and clients in the construction sector in Region 4 were emailed questionnaires. A total of 65 questionnaires were completed and returned for analysis. The ranking of the findings for the causes of delayed payment were determined using the relative importance index for four categories: contractor-related factors, client-related factors, contract-related factors, and consultant-related factors. Effects of delayed payments on contractors’ productivity and finance and actions taken by contractors to overcome delayed problems were also studied. Some of the causes of delayed payment from the study include contractors’ disagreement on valuation of the work, contractors’ failure to substantiate their claims, delay in certification of work done by architect or contract administrator, delay in valuation of work done by quantity surveyor, client delay in certification unrealistic cash, client failure to agree to the valuation of work. From the study, delayed payments results in delay in project progress and have effects on the materials supply capabilities of contractors, the forecasted profit margin, and the amount of the line of credits provided by materials suppliers and banks. Some of the preferred actions taken by contractors include following up with clients by direct communication, applying interest charge to the overdue payments, and slowing down the construction work at site until payment is received.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
依灵完成签到,获得积分10
刚刚
研友_惊鸿发布了新的文献求助10
1秒前
泪西瓜发布了新的文献求助10
1秒前
yuaasusanaann完成签到,获得积分10
1秒前
wanci应助奋斗的冰菱采纳,获得10
1秒前
blt完成签到,获得积分10
2秒前
taotao完成签到,获得积分10
2秒前
1111完成签到,获得积分10
3秒前
明理夏波完成签到 ,获得积分10
4秒前
Churchill87426完成签到,获得积分10
4秒前
4秒前
5秒前
非颜发布了新的文献求助10
6秒前
molihuakai应助豆⑧采纳,获得10
6秒前
7秒前
Y的三次方完成签到 ,获得积分10
7秒前
zhangy发布了新的文献求助10
9秒前
9秒前
10秒前
11秒前
蓝朱发布了新的文献求助30
11秒前
嘻嘻发布了新的文献求助10
14秒前
Y哈哈哈完成签到,获得积分10
14秒前
赘婿应助西北望采纳,获得10
14秒前
渡边卯卯发布了新的文献求助10
15秒前
酸奶蛋羹完成签到 ,获得积分10
15秒前
16秒前
LvXiaodie完成签到,获得积分10
16秒前
16秒前
予秋发布了新的文献求助10
16秒前
18秒前
韩小小完成签到 ,获得积分10
18秒前
渡边卯卯完成签到,获得积分10
19秒前
马丹妮完成签到,获得积分20
19秒前
豆⑧发布了新的文献求助10
20秒前
非颜完成签到,获得积分10
20秒前
QiuQiu完成签到,获得积分10
20秒前
21秒前
megamind完成签到,获得积分10
22秒前
22秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
China Pluperfect I: Epistemology of Past and Outside in Chinese Art 520
Management and the Arts 510
Matrix Methods in Data Mining and Pattern Recognition Second Edition 510
基于锂离子电池正极材料回收的绿色溶剂开发及工程化应用研究 500
Auslegungsgeschichte 500
Transdermal drug delivery systems market size report 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 内科学 物理 复合材料 催化作用 细胞生物学 无机化学 光电子学 物理化学 电极 基因
热门帖子
关注 科研通微信公众号,转发送积分 7642116
求助须知:如何正确求助?哪些是违规求助? 9215191
关于积分的说明 19767902
捐赠科研通 7207492
什么是DOI,文献DOI怎么找? 3276322
关于科研通互助平台的介绍 2438071
邀请新用户注册赠送积分活动 2274067