Problematic issues emerging during BIM implementation process in construction organizations

过程(计算) 过程管理 业务 建筑工程 工程类 工程管理 计算机科学 操作系统
作者
Tran Tuan Kiet
出处
期刊:Built environment project and asset management [Emerald Publishing Limited]
标识
DOI:10.1108/bepam-03-2023-0062
摘要

Purpose Building information modeling (BIM) is a popular technology in modern construction, but its implementation faces numerous difficulties, which are known as problematic issues of BIM implementation (PIBIs). This study aims to identify and analyze PIBIs based on the perceptions of practitioners in Vietnamese BIM-implemented construction contractors and similar BIM adoption-level countries. Design/methodology/approach The research is conducted in three stages. After a comprehensive literature review, PIBIs are identified and ranked based on the Delphi method and questionnaire survey. Next, interpretive structural modeling (ISM) is used to provide a hierarchy of system PIBIs. Finally, the driving and dependence power of PIBIs are determined using Fuzzy-Matrice d'Impacts Croisés-Multiplication Appliquée à un Classement (MICMAC) analysis. Findings This study evaluates 32 PIBIs for small and medium contractors (SMCs) and 28 PIBIs for large contractors (LCs) in Vietnam. This study also develops a systematic framework for contextual relationships and analyzes the relationships among PIBIs using ISM-Fuzzy MICMAC analysis. The results show that different standards or techniques, modeling software limitations and information management significantly impacted LCs, while a lack of senior leadership support and incompatible software affected SMCs, causing other PIBIs. Originality/value This study is among the first attempts to investigate the problematic issues emerging during the BIM implementation process at the organizational level in Vietnam as well as other developing countries. The study results could be considered valuable references for BIM practitioners. Furthermore, this knowledge can enable contractors to avoid problems while adopting BIM, thereby increasing their ability to implement BIM successfully and using critical resources more efficiently.

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
PDF的下载单位、IP信息已删除 (2025-6-4)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
2秒前
2秒前
GwyLsb完成签到,获得积分10
3秒前
3秒前
4秒前
梅梅王发布了新的文献求助10
5秒前
GwyLsb发布了新的文献求助10
7秒前
9秒前
11秒前
隐形曼青应助loong采纳,获得10
11秒前
FashionBoy应助玻璃杯采纳,获得10
11秒前
13秒前
董大米发布了新的文献求助10
14秒前
color完成签到,获得积分10
15秒前
17秒前
cxq发布了新的文献求助10
18秒前
20秒前
研友_V8RB68发布了新的文献求助10
20秒前
李柏余发布了新的文献求助30
23秒前
万能图书馆应助YamDaamCaa采纳,获得200
23秒前
cxl1109发布了新的文献求助10
24秒前
lly发布了新的文献求助10
24秒前
贝壳完成签到,获得积分10
25秒前
29秒前
31秒前
研友_V8RB68完成签到,获得积分10
32秒前
Peng丶Young完成签到,获得积分10
34秒前
望北楼主发布了新的文献求助10
37秒前
若冰完成签到,获得积分10
41秒前
41秒前
42秒前
43秒前
44秒前
xxx发布了新的文献求助10
44秒前
Kevin发布了新的文献求助10
46秒前
阳光棉花糖完成签到,获得积分10
47秒前
47秒前
董大米发布了新的文献求助10
47秒前
52秒前
邓怡发布了新的文献求助10
53秒前
高分求助中
Ophthalmic Equipment Market by Devices(surgical: vitreorentinal,IOLs,OVDs,contact lens,RGP lens,backflush,diagnostic&monitoring:OCT,actorefractor,keratometer,tonometer,ophthalmoscpe,OVD), End User,Buying Criteria-Global Forecast to2029 2000
A new approach to the extrapolation of accelerated life test data 1000
Cognitive Neuroscience: The Biology of the Mind 1000
Technical Brochure TB 814: LPIT applications in HV gas insulated switchgear 1000
Nucleophilic substitution in azasydnone-modified dinitroanisoles 500
不知道标题是什么 500
A Preliminary Study on Correlation Between Independent Components of Facial Thermal Images and Subjective Assessment of Chronic Stress 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 有机化学 生物化学 物理 内科学 纳米技术 计算机科学 化学工程 复合材料 遗传学 基因 物理化学 催化作用 冶金 细胞生物学 免疫学
热门帖子
关注 科研通微信公众号,转发送积分 3965083
求助须知:如何正确求助?哪些是违规求助? 3510376
关于积分的说明 11153120
捐赠科研通 3244755
什么是DOI,文献DOI怎么找? 1792550
邀请新用户注册赠送积分活动 873906
科研通“疑难数据库(出版商)”最低求助积分说明 804024