空气预热器
热交换器
烟气
火用
发电站
锅炉(水暖)
尺寸
超临界流体
火力发电站
联合循环
工艺工程
朗肯循环
蒸汽发电站
热电联产
环境科学
核工程
废物管理
热容率
余热锅炉
传热
可用能
发电
热效率
省煤器
工程类
布莱顿循环
功率(物理)
蓄热式换热器
NTU法
天然气
热的
热回收通风
过热器
余热
作者
Animesh Goswami,T.K. Gogoi
标识
DOI:10.1016/j.ijft.2025.101436
摘要
This study develops a thermo-fluid model of a sCO2 recompression cycle (sCO2-RC) utilizing boiler flue gas of a reheat regenerative steam power plant (RRSPP) and presents exergoeconomic analysis. Two configurations are considered: Configuration 1 (C1) utilizes the exhaust heat first in an air preheater and next in an intermediate heat exchanger and in Configuration 2 (C2) the order is reversed. Key geometric specifications of the heat exchangers are determined alongside the performance parameters like pressure drop, heat transfer coefficients, etc. The net power output of the sCO2-RC in C2 is found to be 8.32 MW, compared to 2.31 MW in C1. Also, C2 has better thermal and exergy efficiencies of 28.91 % and 38.71 %. Previously, the standalone RRSPP incurred a total cost rate of 5,675.84 $/h against a net power of 205.8 MW. Now, with a surplus power of 2.31 MW and 8.32 MW obtained, respectively, from C1 and C2, the additional total cost rates associated with the combined RRSPP-C1 and RRSPP-C2 are found to be 165.04 $/h and 59.33 $/h, respectively. The RRSPP-C2 produces 2.89 % more power with higher efficiencies and has the lowest levelized cost of energy (LCOE) among the three systems—standalone RRSPP, RRSPP-C1 and RRSPP-C2. Therefore, RRSPP-C2 is recommended for sCO2-RC operation together with the SPP.
科研通智能强力驱动
Strongly Powered by AbleSci AI