Shimaa Basheir Abdelkarim,Ahmad Mohammad Ahmad,Khalid K. Naji
标识
DOI:10.1061/jmenea.meeng-5623
摘要
The construction project information for FM team control and maintenance is vital. However, current practices indicate significant data drops during the handover stage, leading to rework during FM systems integration of inaccurate, delivered information. Although challenges in BIM implementation are well studied, there is a current lack of best practices from FM industry experts highlighting challenges with a specific focus on the areas of the data drop. Therefore, the aim is to develop a framework that can reduce data loss and improve data management. The objectives include robust literature review on challenges of information loss during handover phase, management and frameworks; Adopting case study and workshops to identify information loss challenges, framework development and validation with industry experts. This paper adopted a grounded theory approach to explore literature and conducted case studies, including a series of semistructured interviews and a workshop with FM industry experts. The findings show the areas and causes of information loss and how to manage them through the developed information loss management framework (ILMF).
科研通智能强力驱动
Strongly Powered by AbleSci AI