喷射混凝土
不连续性分类
新奥地利隧道法
间断(语言学)
岩土工程
发掘
结构工程
理论(学习稳定性)
工程类
岩体分类
计算机科学
数学
数学分析
机器学习
作者
Yiming Zhang,Xiaoying Zhuang,Roman Lackner
摘要
Summary For tunnel constructed by New Austrian Tunnelling Method, the crown is the upper part of tunnel section, constructed during excavation process and supported by shotcrete. The stability of the crown has great influence on the safety of tunnel itself and the buildings above, which correlates, among others, with geometrical setup of tunnel and material properties of shotcrete and soil/rock. In this paper, aiming at analyzing the stability of shotcrete supported crown, a recently presented numerical method discontinuity layout optimization is adopted, which introduces a great amount of potential discontinuities cross over one another and provides a wide search space for efficient upper limit analysis. In the analysis, a well‐established hydration model of cementitious material is implemented for accounting the hydration of shotcrete. Then assumptions based on convergence‐confinement method are used for accounting the 3‐dimensional effect in 2‐dimensional analysis, finally providing time‐space–dependent assessments of stability of shotcrete supported crown.
科研通智能强力驱动
Strongly Powered by AbleSci AI