CVAR公司
数学优化
瓶颈
任务(项目管理)
产品(数学)
计算机科学
劳动力
还原(数学)
预期短缺
运筹学
风险管理
工程类
数学
经济
嵌入式系统
系统工程
几何学
管理
经济增长
作者
Xin Liu,Feng Chu,Feifeng Zheng,Chengbin Chu,Ming Liu
标识
DOI:10.1080/00207543.2021.1881648
摘要
Existing works usually focus on the single-product disassembly line balancing problem (DLBP). In practice, end-of-life (EOL) products to be disassembled may be heterogeneous, and the actual processing time of each task may vary with its assigned worker. This work studies a stochastic multi-product DLBP with workforce assignment, to minimise the system cost. Due to historical data scarcity, we assume that only partial distributional information of uncertain task processing times is known. Exceeding the preset cycle time may lead to a disassembly performance reduction, thus we control the cycle time violation via conditional Value-at-Risk (CVaR) constraints, i.e. in a risk-averse fashion. For the problem, we first propose a novel formulation with distributionally robust CVaR constraints. Then some valid inequalities are proposed, leading to an improved model. Two solution approaches, i.e. an exact cutting-plane method and an approximation method, are further proposed and compared, via numerical experiments. Some managerial insights are also drawn.
科研通智能强力驱动
Strongly Powered by AbleSci AI