预制混凝土
总体规划
调度(生产过程)
生产计划
尺寸
工程类
到期日
物资需求计划
工业工程
运筹学
计算机科学
生产(经济)
地铁列车时刻表
运营管理
土木工程
艺术
视觉艺术
宏观经济学
操作系统
经济
摘要
In the research, an integrated planning and scheduling model, IPSMPP, is established for make-to-order precast production using a comprehensive casting organization. IPSMPP covers both aggregate planning at the tactical level and detailed scheduling at the operational level. Five modules at the two levels are designed for different planning purposes. A Simulation-GA based approach is proposed to solve specific problems in every module. Specialized priority rules and bidirectional simulation passes are further formulated in order to improve the schedule performance. Based on the model and its inner workings, a prototype system has been developed for model validation. Finally, two tests are conducted for aggregate planning and detailed scheduling respectively. The validity of IPSMPP has been demonstrated by comparison of the results from the prototype system, planning methods used in practice, and other traditional approaches. IPSMPP can considerably reduce not only the total variable cost, but also cost in nearly every cost category, thus leading to feasible schedules with best performance. In conclusion, the main contributions made in this research lies in the following aspects.
科研通智能强力驱动
Strongly Powered by AbleSci AI