过程(计算)
估计
成本估算
计算机科学
设计过程
可靠性工程
建筑信息建模
工程设计过程
工程类
工业工程
系统工程
在制品
机械工程
运营管理
操作系统
调度(生产过程)
作者
Gwang-Hee Kim,Hyun Young Park,Jae Min Shin
标识
DOI:10.4028/www.scientific.net/amm.291-294.2822
摘要
The completion of the design drawing has not been credited in the construction market in Korea, and the modeling information of the design phase cannot be effectively used in an estimation process. Therefore, the objective of this study is to assess the cost estimating accuracy of a BIM tool in the design process to verify its applicability. Modeling was done for a building in an actual project to evaluate the applicability, from which the causes of errors of quantity take-off were derived.
科研通智能强力驱动
Strongly Powered by AbleSci AI