The Friendship Bridge in Liuzhou City is a prestressed concrete continuous girder bridge having seven spans in one continuous unit and a total length of its main bridge 583 m and main span 95 m.In this paper,the systems,methods,contents and principal results of construction monitoring and control of the Bridge are dealt with.