摘要
Production scheduling plays a pivotal role in smart factories due to the development of intelligent manufacturing. As a typical scheduling problem, the blocking flow-shop scheduling problem (BFSP) has attracted enormous attention from researchers. In this paper, an ensemble discrete water wave optimization algorithm (EDWWO) is proposed with the criterion to minimize the makespan. In the proposed algorithm, a constructive heuristic is presented to suit the needs of initial solutions quality. The constructive heuristic is based on a new dispatching rule combined with the well-known NEH heuristic. The algorithmic characteristics are explored and effective technologies, such as data-driven mechanism in the propagation phase, a block-shifting operator based on the framework of the variable neighborhood search in the breaking phase, and perturbation strategy, are employed to improve the performance of the algorithm. The effectiveness of operators and parameters in EDWWO are analyzed and calibrated based on the design of experiments. To evaluate the algorithmic performance, the well-known benchmark problem is adopted for comparison with five other state-of-the-art algorithms. Meanwhile, the statistical validity of the results is investigated by introducing the Friedman-test and Wilcoxon-test. The statistical results demonstrate the effectiveness of EDWWO for solving the BFSP.
科研通智能强力驱动
Strongly Powered by AbleSci AI