违规
自动频率控制
渗透(战争)
风力发电
频率调节
电力系统
控制理论(社会学)
控制(管理)
工程类
功率(物理)
环境科学
计算机科学
电气工程
经济
物理
运筹学
市场经济
量子力学
人工智能
作者
Yiming Zeng,Xuhui Bu,Yanling Yin
摘要
Abstract With the gradual deregulation of the power system by the power department, the power system has developed into a large‐scale and multiregional control system. Because of the power system internal complexity enhancing, the stable operation of power system becomes increasingly difficult. This paper analyzes the load frequency control problem of multiregional interconnected power system with wind energy. This study designs an improved model‐free adaptive control algorithm based on I/O data. It avoids model establishment of the multiregional power system. It also effectively solves the problem of frequency stability control under the influence of load change, introducing the generation participation matrix to simulate bilateral contracts under the power market. The dynamic evolution relationship of the system with the generation participation matrix is established, taking a three‐regional power system with wind energy as an example. Frequency fluctuations in all three regions are between . Convergence times of frequency deviation are all within 30 s, much less than the response time of load frequency control. The simulation results further demonstrate the effectiveness of the proposed algorithm, comparing the control algorithm proposed in this paper with other algorithms, which proves that the proposed algorithm has good control performance.
科研通智能强力驱动
Strongly Powered by AbleSci AI